Search found 95 matches
- Mon Dec 07, 2009 2:16 am
- Forum: New features
- Topic: Layer and leadin/out control
- Replies: 4
- Views: 7224
Layer and leadin/out control
Would it be possible to have the layers include a specific leadin/out spec. For plasma work I always spec layer 0 for no offestting and use NO leadin/out Layer 1 is for inside offsetting and always use leadin arc of .15 and NO leadout Layer 2 is for outside offsetting and always use a .5 leadin arc ...
- Sun Dec 06, 2009 3:49 pm
- Forum: New features
- Topic: Feature to notify when a section of posted drawing fails
- Replies: 3
- Views: 4898
Feature to notify when a section of posted drawing fails
Les it failed in areas where there was NOT enough room to do the offsetting without gouging the part. I had reduced the drawing scale and missed that area. When posting, it started the section and when it got to the narrow section it did post that part BUT it did NOT post the rest of the section tha...
- Sat Dec 05, 2009 1:25 am
- Forum: New features
- Topic: Feature to notify when a section of posted drawing fails
- Replies: 3
- Views: 4898
Feature to notify when a section of posted drawing fails
HIYA LES, I have had several files lately that had sections fail to post for various reasons. Is there any way to alert us to the fact that sections failed to post. They all failed for legitamit reasons(;-) But with a huge plasma file that takes almost a hour to cut the small sections seem to go unn...
- Tue Nov 10, 2009 1:20 am
- Forum: New features
- Topic: Job report/job costing
- Replies: 6
- Views: 8661
Job report/job costing
Perhaps a small database for the material selction that would allow us to include material cost for each selection. Then just use the extents for the square inches and the starts and cut inches. I guess you would also need a cost input for the starts and cost per inch for cuts. Thanks for the consid...
- Mon Nov 09, 2009 8:49 pm
- Forum: New features
- Topic: Job report/job costing
- Replies: 6
- Views: 8661
Job report/job costing
Hi Less, I was wondering IF the job report could include the x/y extense for the part cut in plasma. This would give us a better grip on costing out the job material wise. Also wondering IF you could include a costing formula base on material size and thickness and cutting inches and starts. Maybe a...